Network Status
-
City Cable Network
-
NBN Network
-
Opticomm Network
-
Lynham Network
Current Incidents
8 Franklin Street
Apr 16, 2025 – 09:03 AEST
We apologise for any inconvenience caused and are working to resolve issue as soon as possible.
Apr 16, 2025 – 01:53 AEST
Scheduled Maintenance
-
Multiple Sites Apr 16, 2025 23:00 - Apr 17, 2025 03:00 AEST
Network Engineers will be performing routine maintenance to our network which will affect customer services at multiple sites.
Sites Affected:
148 Wells Street, Southbank
28 Freshwater Place, Southbank
99 Queens Bridge Street, Southbank
28 Clarendon Street, Southbank
2 Southbank Boulevard, Southbank
6 Riverside Quay, Southbank
8 Kavanagh Street, Southbank
88 Southbank Boulevard, Southbank
7 Riverside Quay, Southbank
38 Kavanagh Street, Southbank
33 City Road, Southbank
269-283 City Road, Southbank
22 Kavanagh Street, Southbank
1 Freshwater Place, Southbank
86-92 Kavanagh Street, Southbank
99 Whiteman Street, Southbank
83 Whiteman Street, Southbank
79 Whiteman Street, Southbank
63 Whiteman Street, Southbank
55 Southbank Boulevard, Southbank
241 City Road, Southbank
22-24 Dorcas Street, Southbank
183 City Road, Southbank
178-180 City Road, Southbank
173 City Road, Southbank
163 City Road, Southbank
100 Kavanagh Street, Southbank
109 Clarendon Street, Southbank
1 Riverside Quay, Southbank
151-153 Clarendon Street, Southbank
39 Dorcas Street, South Melbourne
38 Bank Street, South Melbourne
28 Bank Street, South Melbourne
69 Dorcas Street, South Melbourne
63 Dorcas Street, South Melbourne
Service disruptions may be experienced during this window. -
27 Charnwood Road, St Kilda Apr 17, 2025 08:00-09:00 AEST
Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections.
Service disruptions may be experienced during this window. -
578 Lorimer Street, Port Melbourne Apr 17, 2025 23:00 - Apr 18, 2025 02:00 AEST
Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections.
Service disruptions may be experienced during this window. -
576-578 Saint Kilda Road, Melbourne Apr 23, 2025 01:00-03:00 AEST
Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections.
Service disruptions may be experienced during this window. -
Multiple Sites Apr 29, 2025 21:00 - Apr 30, 2025 02:00 AEST
Network Engineers will be performing routine maintenance to our network which will affect customer services at multiple sites.
Sites Affected:
33 Chessell Street, Southbank
221 Sturt Street, Southbank
68 Clarke Street, Southbank
Service disruptions may be experienced during this window.
Past Incidents
-
Apr 16, 2025Completed - The scheduled maintenance has been completed. Apr 16, 09:00 AESTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Apr 16, 08:00 AESTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Apr 8, 14:03 AESTResolved - A power issue at site caused a loss of connection to network equipment. Power has been restored, and services are back online. Apr 16, 04:36 AESTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Apr 16, 04:05 AESTCompleted - The scheduled maintenance has been completed. Apr 16, 03:00 AESTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Apr 15, 23:00 AESTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Apr 7, 10:29 AEST
-
Apr 15, 2025Resolved - Damaged devices have been replaced, and services are back online. Apr 15, 13:54 AESTUpdate - The water leak has been resolved, however damage has occurred to network equipment. DGtek field engineers have been dispatched to repair or replace the damaged equipment. Apr 15, 10:25 AESTIdentified - A water leak in the building has caused a loss of power to network equipment within the building. Building management is currently working to resolve the water leak. Further updates to be provided as the come to us. Apr 15, 08:29 AESTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Apr 14, 22:15 AESTCompleted - The scheduled maintenance has been completed. Apr 15, 12:00 AESTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Apr 15, 10:00 AESTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window.
-
Apr 13, 2025Completed - The scheduled maintenance has been completed. Apr 13, 06:00 AESTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Apr 12, 21:00 AESTScheduled - Network Engineers will be performing emergency maintenance to our network which will affect customer services at multiple sites. Sites Affected:356 Collins St, Melbourne350 Collins Street, MelbourneService disruptions may be experienced during this window.
-
Apr 12, 2025Resolved - This incident has been resolved. Apr 12, 08:33 AESTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible.
-
Apr 10, 2025Completed - The scheduled maintenance has been completed. Apr 10, 04:00 AESTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Apr 9, 23:00 AESTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window.
-
Apr 9, 2025Multiple SitesCompleted - The scheduled maintenance has been completed. Apr 9, 07:00 AESTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Apr 9, 05:00 AESTScheduled - Network Engineers will be performing routine maintenance to ouur network which will affect customer services at multiple sites. Sites Affected:
- 568 Collin Street, Melbourne
- 623 Little Bourke St, Melbourne
- 533 Little Lonsdale Street, Melbourne
- 607 Bourke Street, Melbourne
- 333 Queen Street, Melbourne
- 600 Bourke Street, Melbourne
- 5 Flockhart Street, Abbotsford
- 353 Napier Street, Fitzroy
- 300 Young Street, Fitzroy
- 18 Grosvenor Street, Abbotsford
- 8 Grosvenor Street, Abbotsford
- 11 Flockhart Street, Abbotsford
- 8 Franklin Street, Melbourne
- 601 Victoria Street, Abbotsford
- 620 Collins Street, Melbourne
- 58 Jeffcott Street, West Melbourne
- 483 Swanston Street, Melbourne
- 416 Gore Street, Fitzroy
- 33 Batman Street, West Melbourne
- 25-27 Therry Street, Melbourne
- 2 Cobden Street, North Melbourne
- 150 Kerr Street, Fitzroy
- 181 A'Beckett Street, Melbourne
- 118 Dudley Street, West Melbourne
- 668 Bourke Street, Melbourne
- 568 Collins Street, Melbourne
- 198 Harbour Esplanade, Docklands
- 9-23 Mackenzie Street, Melbourne
- 228 La Trobe Street, Melbourne
-
Apr 7, 2025
200 Spencer Street
Resolved - The power maintenance in the building is finished. The internet connection is now fixed. Update - The Power issue is still affecting the internet connection. Check with the building manager for the solution. Update - The internet issue is fixed. Still monitoring the service.Update - The building manager confirmed that there are power outages in the building. The electricians are checking the power floor by floor. The issue should be able to be finished by 12 PM.Investigating - Engineers have observed network alarms at the listed site, which are causing disruption to some customer services. The support team is contacting the building manager for details. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. -
Mar 31, 2025Resolved - The Building Manager advised that a third party had shut down power to network devices. Power has been restored, and services are back online. Mar 31, 08:15 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible.
Multiple Sites
80 Clarendon Street, Southbank2 Albert Road, Southbank3-11 High Street, North Melbourne68 La Trobe Street, Melbourne8 Franklin Street, Melbourne483 Swanston Street, Melbourne139 Lonsdale Street, Melbourne280 Spencer Street, Melbourne200 Spencer Street, Melbourne225 Elizabeth Street, Melbourne200 Spencer Street, Melbourne455 Elizabeth Street, Melbourne640 Swanston Street, Carlton604 Swanston Street, CarltonInvestigating - Engineers have observed network alarms at the listed site, which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available.Update - Major fibre damage by third party workers on Spencer Street. All Melbourne CBD area will be affected. Urgent repair is ongoing.Update - Internet Connection apparently restored. Keep monitoring.Resolved - The damaged fibre has been repaired. The internet connection has been restored.We apologise for any inconvenience caused and are working to resolve issue as soon as possible. -
Mar 30, 2025Resolved - An uplink device issue was identified as the secondary cause of the loss of service, and a temporary workaround has been put in place in order to restore services. Further maintenance may be required at a later date to permanently resolve this fault. Mar 30, 18:25 AEDTUpdate - DGTek field technicians are continuing on-site investigations. Further updates to come. Mar 30, 16:31 AEDTUpdate - Building manager has advised that power has been restored, however network devices remain offline. A DGtek field technician has been dispatched to investigate further. Mar 30, 12:53 AEDTUpdate - DGtek have been advised that a power issue in the building is currently affecting network devices. ETR 2PM. Mar 30, 10:02 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible.
-
Mar 28, 2025Resolved - A power outage in the area caused a loss of connection. Power restored, and services back online. Mar 28, 11:58 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible.
-
Mar 27, 2025Network Engineers will be performing emergency maintenance to network infrastructure at the following sites which will impact customer connections:
- 122 River Esplanade, Docklands
- 128 Lorimer Street, Docklands
- 118 River Esplanade, Docklands
- 116 River Esplanade, Docklands
- 13 Point Park Crescent, Docklands
- 1 Point Park Crescent, Docklands
- 5 Point Park Crescent, Docklands
- 108 River Esplanade, Docklands
- 112 River Esplanade, Docklands
- 120 River Esplanade, Docklands
-
Mar 25, 2025Resolved - DGtek Fibre has been repaired, and services restored. Mar 25, 14:45 AEDTUpdate - DGtek Field crews have located the broken fibre, and repairs will require concrete cutting works at site. Field crews are working with Building Management to obtain agreement to perform these works. Further updates to be provided as they come to us. Mar 25, 14:30 AEDTUpdate - DGtek field crews are continuing works to repair the damaged fibre. Further updates to be provided as the come to us. Mar 25, 11:24 AEDTUpdate - DGtek field crews are continuing works to repair the damaged fibre. Further updates to be provided as the come to us. Mar 24, 17:26 AEDTIdentified - Damage to DGtek fibre has been identified, and field crews are working to repair the damaged fibre. Mar 24, 10:46 AEDTUpdate - Field technicians have been dispatched to further investigate this issue. Mar 24, 10:32 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 24, 10:31 AEDTCompleted - The scheduled maintenance has been completed. Mar 25, 06:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Mar 25, 00:00 AEDTScheduled - Our up-stream carrier will be performing routine maintenance to their network which will impact customer services at 161 Parramatta Road, Alburn. Service disruptions may be experienced during this window. Feb 6, 10:01 AEDT
-
Mar 24, 2025Completed - The scheduled maintenance has been completed. Mar 24, 21:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Mar 24, 18:00 AEDTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Mar 17, 11:14 AEDTResolved - A faulty switch was identified, and replaced. Services are back online. Mar 24, 13:57 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 21, 23:22 AEDT
-
Mar 22, 2025Resolved - A power outage in the area has been resolved, and services are back online. Mar 22, 14:02 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 22, 08:13 AEDTResolved - A power outage in the area has been resolved, and services are back online. Mar 22, 14:02 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 22, 08:13 AEDT
-
Mar 21, 2025Completed - The scheduled maintenance has been completed. Mar 21, 11:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Mar 21, 09:00 AEDTScheduled - Network Engineers will be performing emergency maintenance to network infrastructure at the listed site which will impact customer connections.
- 35 Malcolm Street, South Yarra
- 9 Yarra Street, South Yarra
- 50 Claremont Street, South Yarra
- 23-35 Malcolm Street, South Yarra
- 42 Ralston Street, South Yarra
- 7 Yarra Street, South Yarra
- 18 Yarra Street, South Yarra
-
Mar 20, 2025Resolved - Electrical maintenance has been completed. Mar 20, 16:46 AEDTIdentified - DGtek have been advised that electrical maintenance is underway in the building which is affecting customer connections. Mar 20, 16:18 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 20, 16:18 AEDT
-
Mar 19, 2025Resolved - Electrical maintenance has been completed. Mar 19, 14:49 AEDTIdentified - DGtek have been advised that electrical maintenance is underway within the building which is affecting services. Further updates will be provided as they come to us. Mar 19, 12:55 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 19, 12:55 AEDT
-
Mar 18, 2025Resolved - Maintenance has been completed. Mar 18, 15:59 AEDTIdentified - DGtek have have been advised that electrical testing is underway which may affect customer connections. Further updates to be provided. Mar 18, 12:26 AEDTInvestigating - Engineers have observed network alarms which are currently causing disruption to services for some customers across multiple sites. Engineers are now investigating the issue. Further updates will be given as soon as they are available. Sites Affected:
- 5 Flockhart Street, Abbotsford
- 11 Flockhart Street, Abbotsford
- 8 Grosvenor Street, Abbotsford
We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 18, 12:26 AEDT -
Mar 15, 2025Resolved - Fibre connection is restored. Broken fibre and damaged ducts are fixed, and services are back online. Mar 17, 13:45 AEDTInvestigating -Network fault is causing internet disruption to some of the units. We are working on it to rectify the service. Sorry for the inconvenience. Mar 15, 14:35 AEDT
Service fibre and ducts were damaged by tradesmen working on the ground in the common area. Owner Corporate informed. A major repair is underway.We apologise for any inconvenience caused. Mar 16, 09:00AEDT -
Mar 13, 2025Completed - The scheduled maintenance has been completed. Mar 13, 22:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Mar 13, 17:00 AEDTScheduled - Network Engineers will be performing routine maintenance to our network which will affect customer services at multiple sites. Sites Affected:
- 8 Waterview Walk, Docklands
- 12 Waterview Walk, Docklands
- 18 Waterview Walk, Docklands
- 100 Harbour Esplanade, Docklands
- 757 Bourke Street, Docklands
Completed - The scheduled maintenance has been completed. Mar 13, 09:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Mar 13, 06:00 AEDTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Mar 7, 16:39 AEDT -
Mar 11, 2025Resolved - A power issue at site caused a loss of connection. Power has been restored, and services are back online. Mar 11, 13:40 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 11, 12:36 AEDT
-
Mar 6, 2025Completed - The scheduled maintenance has been completed. Mar 6, 22:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Mar 6, 18:00 AEDTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed suburbs which will impact customer connections.
- Moorabbin, 3189
- Heatherton, 3202
- St Kilda, 3182
- Mentone, 3194
- Melbourne, 3004
- Ripponlea, 3185
- Cheltenham, 3192
- Elwood, 3184
- Brighton, 3186 Service disruptions may be experienced during this window. Feb 27, 15:00 AEDT
-
Mar 5, 2025Resolved - A tripped circuit breaker in the building cased a loss of power to network equipment. Circuit breaker has been reset, and services are back online. Mar 5, 14:14 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 5, 09:41 AEDT
-
Mar 4, 2025Resolved - A power issue in the building caused a loss of power to network equipment. Power has been restored, and services are back online. Mar 4, 14:35 AEDTMonitoring - A fix has been implemented and we are monitoring the results. Mar 4, 14:10 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 4, 13:40 AEDTResolved - A power issue in the building caused a loss of power to a network edge device. Power has been restored, and services are back online. Mar 4, 10:10 AEDTUpdate - Field engineers have been scheduled to further investigate this incident. ETA 04/03/2025 between 9AM-5PM Mar 3, 14:23 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 3, 13:53 AEDT
-
Mar 3, 2025Resolved - A power issue at site caused a loss of service to the wireless radio connecting this site. Power restored, and services back online. Mar 3, 09:41 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Mar 3, 00:16 AEDTFeb 27, 2025Completed - The scheduled maintenance has been completed. Feb 27, 15:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 27, 12:00 AEDTScheduled - Network Engineers will be performing emergency maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Feb 24, 15:55 AEDTFeb 25, 2025Completed - The scheduled maintenance has been completed. Feb 25, 11:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 25, 08:00 AEDTScheduled - Network Engineers will be performing emergency maintenance to network infrastructure at the listed sites which will impact customer connections.
- 23-35 Malcolm Street, South Yarra
- 35 Malcolm Street, South Yarra
- 50 Claremont Street, South Yarra
- 42 Ralston Street, South Yarra
- 7 Yarra Street, South Yarra
- 9 Yarra Street, South Yarra
- 18 Yarra Street, South Yarra
Completed - The scheduled maintenance has been completed. Feb 25, 10:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 25, 08:00 AEDTScheduled - Network Engineers will be performing emergency maintenance to network infrastructure at the listed sites which will impact customer connections.- 29-37 Genoa Street, Moorabbin
- 13 Corporate Dr, Heatherton
- 120 Chesterville Road, Mentone
- 424 Warrigal Road, Heatherton
- 15 Corporate Drive, Heatherton
- 81 Warrigal Road, Mentone
- 7 Balcombe Road, Mentone
- 35 Childers Street, Mentone
- 15 Balcombe Road, Mentone
- 158 Chesterville Road, Cheltenham
- 150-156 Chesterville Road, Cheltenham
- 215 Chesterville Road, Moorabbin
- 47 Capella Crescent, Moorabbin
- 156 Cochranes Road, Moorabbin
- 136 Cochranes Road, Moorabbin
- 105 Cochranes Road, Moorabbin
Feb 24, 2025Resolved - A software issue with an edge device caused a loss of service for several floors. Edge device rebooted, and services restored. Feb 24, 13:03 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible.Feb 22, 2025Resolved - A power outage in the building caused a loss of power to network equipment. Feb 22, 22:56 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Feb 22, 16:11 AEDTCompleted - The scheduled maintenance has been completed. Feb 22, 02:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 21, 22:00 AEDTScheduled - Our up-stream carrier will be performing routine maintenance to their network which will impact customer VoIP services. Service disruptions may be experienced during this window. Feb 17, 11:59 AEDTFeb 19, 2025Resolved - A water leak in the riser caused a loss of power to network equipment. Power has been restored, and services are back online. Feb 19, 13:07 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Feb 19, 09:53 AEDTFeb 16, 2025Completed - The scheduled maintenance has been completed. Feb 16, 03:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 16, 01:00 AEDTScheduled - Network Engineers will be performing routine maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Jan 20, 17:20 AEDTFeb 14, 2025Resolved - A tripped circuit breaker caused a loss of power to network equipment. Power has been restored, and services are back online. Feb 14, 11:16 AEDTInvestigating - Engineers have observed network alarms at the listed site which are causing disruption to some customer services. Engineers are now investigating the issue. Further updates will be given as soon as they are available. We apologise for any inconvenience caused and are working to resolve issue as soon as possible. Feb 14, 05:34 AEDTCompleted - The scheduled maintenance has been completed. Feb 14, 07:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 13, 21:00 AEDTScheduled - Network Engineers will be conducting critical emergency maintenance to safeguard our fibre network and prevent a potential large-scale outage. This essential work will temporarily impact customer connections in the following suburbs:- Albert Park 3205
- Brighton 3186
- Cheltenham 3192
- Elwood 3184
- Heatherton 3202
- Melbourne 3004
- Mentone 3194
- Moorabbin 3189
- Ripponlea 3185
- South Melbourne 3205
- South Yarra 3141
- Southbank 3006
- St Kilda 3182
Feb 13, 2025Completed - The scheduled maintenance has been completed. Feb 13, 13:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 13, 11:00 AEDTScheduled - Network Engineers will be performing emergency maintenance to network infrastructure at the listed site which will impact customer connections. Service disruptions may be experienced during this window. Feb 12, 13:42 AEDTCompleted - The scheduled maintenance has been completed. Feb 13, 04:00 AEDTIn progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. Feb 12, 23:00 AEDTScheduled - Network Engineers will be performing routine maintenance to our network which will affect customer services at multiple sites. Sites Affected:574 St Kilda Road, Melbourne181 St Kilda Road, Melbourne636 St Kilda Road, MelbourneService disruptions may be experienced during this window. Feb 7, 12:36 AEDT
For planned maintenance or unforeseen incidents that may cause a nbn® outage, check the nbn® network outages page.
Current Incident
Outage Status | Inprogress | ||||||
---|---|---|---|---|---|---|---|
Outage Raised | 2025-03-27 11:40:00 +11:00 | ||||||
Comments |
|
||||||
impacted Locations |
|
Scheduled Maintenance
-
2025-03-20
Description Opticomm wishes to advise of a planned maintenance period taking place 20/03 from 08:00 - 16:00 AEDT. During this period, services will be impacted on a rolling basis for up to an hour per interruption Outage Start 2025-03-20 08:00:00 +11:00 Outage End 2025-03-20 16:00:00 +11:00 Outage Duration 8 Hours impacted Locations ALMN : Alamanda LIFE : Life -
2025-04-09
Description Opticomm wishes to advise of upcoming maintenance works in Honeywood WA (HNYW). These works will occur on 09/04/205 through the hours of 8:00 - 16:00 AWST. Services will be interrupted on a rolling basis of 1 hour per interruption. Outage Start 2025-04-09 09:00:00 +08:00 Outage End 2025-04-09 17:00:00 +08:00 Outage Duration 8 Hours impacted Locations HNYA : Honeywood - Aurora HNYW : Honeywood WNDI : Wandi South
Past Incidents
-
2025-03-11
Description Opticomm wishes to inform you of a scheduled network event. Engineers will be performing planned maintenance at YABD in Alphington, VIC. During the maintenance window customers will be disconnected from the network and unable to reconnect for up to 2 hours. This maintenance is to complete a backhaul upgrade with our third-party carrier to ensure the ongoing reliability and performance of the network. We apologise for any inconvenience. Outage Start 2025-03-11 00:00:00 +11:00 Outage End 2025-03-11 03:00:00 +11:00 Outage Duration 3 Hours impacted Locations YABD : YarraBend -
2025-03-05
Description Opticomm wishes to advise of an upstream network maintenance being performed by our backhaul provider Telstra, Maintenance period of 00:00 - 06:00 AEDT on the 5th of March. During this period, services will experience an interruption of up to 1.5 hours Outage Start 2025-03-05 00:00:00 +11:00 Outage End 2025-03-05 06:00:00 +11:00 Outage Duration 6 Hours impacted Locations ALMN : Alamanda HARP : Harpley HARQ : Harpley Town Centre LIFE : Life -
2025-03-02
Description Opticomm wishes to advise of a Telstra backhaul planned network maintenance period taking place on 02nd March 2025 from 00:00 AEDT to 06:00 AEDT. During this period, services at BRIC are expected to be impacted by total service loss for up to 5 mins. Outage Start 2025-03-02 00:00:00 +11:00 Outage End 2025-03-02 06:00:00 +11:00 Outage Duration 6 Hours impacted Locations BRIC : Burwood Brickworks -
2025-02-26
Description • Details: We are upgrading the OLT software to enhance network stability and thus there will be loss of all internet services during the maintenance window. Outage Start 2025-02-26 00:00:00 +11:00 Outage End 2025-02-26 06:00:00 +11:00 Outage Duration 6 Hours impacted Locations AGCK : Armstrong Creek ASPR : Aspire ASWE : Aspire West AURA : Aurora CIRC : Circa Apartments CLBD : IQ ENCR : Encore JUNC : The Junction KEW3 : 35 Kenny St KEWO : Hannaville Apartments LICR : 402 Liverpool Road MERY : 33-37 Mentmore Ave NCLE : 141-161 New Canterbury Road QUEN : The Queen RDST : Redstone REKO : Kogarah Grand STBK : Stonybrook STCL : St. Claire STKO : Premiere STMZ : St Moritz VILA : Villawood Place VINE : Victoria and Vine VIVI : Vista Victoria WTWD : Westwood YAGA : Yaringa AGCC : Armstrong Creek C AURB : Aurora CAA ADTRAN DUNO : Due North HACT : 15-21 Hampton Court Road HGST : 143 High St, Preston LCCN : 205 Hardys Rd, Lifestyle Communities MOKO : Monument NICA : The Nielsen Apartments Carlton REK5 : Gallery Collective Kogarah REK8 : The Monroe RUBU : The Ruby SCOM : Sawtell Commons VIKO : Victoria & George WILL : Willow YAGD : Yaringa DASAN -
2025-02-25
Description Engineers will be performing planned maintenance at BRIC in Burwood, VIC. During the maintenance window customers will be disconnected from the network and unable to reconnect for up to 2 hours. This maintenance is to complete a backhaul upgrade with our third-party carrier to ensure the ongoing reliability and performance of the network. We apologise for any inconvenience. Outage Start 2025-02-25 00:00:00 +11:00 Outage End 2025-02-25 03:00:00 +11:00 Outage Duration 3 Hours impacted Locations BRIC : Burwood Brickworks
Description | Opticomm wishes to inform you of a scheduled network event. Engineers will be performing planned maintenance at YABD in Alphington, VIC. During the maintenance window customers will be disconnected from the network and unable to reconnect for up to 2 hours. This maintenance is to complete a backhaul upgrade with our third-party carrier to ensure the ongoing reliability and performance of the network. We apologise for any inconvenience. | |
---|---|---|
Outage Start | 2025-03-11 00:00:00 +11:00 | |
Outage End | 2025-03-11 03:00:00 +11:00 | |
Outage Duration | 3 Hours | |
impacted Locations |
|
Scheduled Maintenance
-
Melbourne 2025-04-17
Type: Scheduled Title: #1252 – Upstream Network Maintenance - VIC Start Date/Time: 2025-04-17 00:00:00 End Date/Time: 2025-04-17 03:00:00 Timezone: Melbourne, AU (AEST/AEDT) -
Rothwell QLD 2025-04-17
Type: Scheduled Title: #1250 – Upstream Network Maintenance - Rothwell QLD Start Date/Time: 2025-04-17 00:00:00 End Date/Time: 2025-04-17 03:00:00 Timezone: Melbourne, AU (AEST/AEDT)
Past Incidents
-
2025-04-02
Title: #1249 – Network Incident - Montclair Ave, Glen Waverley, VIC Start Date/Time: 2025-04-02 06:45:00 End Date/Time: 2025-04-02 09:45:00 Timezone: Melbourne, AU (AEST/AEDT) -
2025-03-06
Title: #1211 – Emergency Maintenance Notification - 370 Smith Street Collingwood VIC Start Date/Time: 2025-03-06 07:00:00 End Date/Time: 2025-03-06 11:00:00 Timezone: Melbourne, AU (AEST/AEDT) -
2025-03-05
Title: #1197 – Network Activity Update - 370 Smith Street Collingwood VIC Start Date/Time: 2025-03-05 08:00:00 End Date/Time: 2025-03-05 11:00:00 Timezone: Melbourne, AU (AEST/AEDT) -
2025-02-26
Title: #1186 – Network Maintenance - 19 Kombi Street Bokarina QLD Start Date/Time: 2025-02-26 07:00:00 End Date/Time: 2025-02-26 09:00:00 Timezone: Melbourne, AU (AEST/AEDT) -
2025-02-25
Title: #1200 – Network Activity Update - 3 Mckillop Street Rothwell QLD Start Date/Time: 2025-02-25 06:00:00 End Date/Time: 2025-02-25 10:00:00 Timezone: Melbourne, AU (AEST/AEDT) -
2025-02-20
Title: #1178 – Network Maintenance - 301 King Street Melbourne VIC Start Date/Time: 2025-02-20 07:00:00 End Date/Time: 2025-02-27 09:00:00 Timezone: Melbourne, AU (AEST/AEDT) -
2025-02-19
Title: #1183 – Upstream Network Maintenance - 153 Government Road Richlands QLD Start Date/Time: 2025-02-19 05:00:00 End Date/Time: 2025-02-19 07:00:00 Timezone: Melbourne, AU (AEST/AEDT)